The project
At Edison Park in The Nations neighborhood of Nashville, Trinity Earthworks completed all grading and excavation for five bio-retention ponds that manage the site’s stormwater.
Each pond was excavated to its engineered depth and contours and graded so runoff flows where the design calls for it. The work included removing and hauling off about 4,000 tons of material.
Photos








